Limestone steppers installed
Installed the limestone stepping stones through the garden.
Garden Journal — In progress
Repositioned a habitat rock to help catch water, and watered in the new plants.
Installed the limestone stepping stones through the garden.
Removed a tree from the garden as part of the ongoing works.
Sally had noticed the garden lights weren't working. Worked through a few possible causes before finding it — the LED sockets had corroded and worn out. The worn sockets still need to be purchased and replaced.
Installed the igneous habitat rocks, logs, concrete chairs and garden light into the beds.
Discovered a mains line during works, which required moving a garden light to clear it.
Reset the garden edging and repaired the irrigation on site.
Pressure washed hard surfaces on site.
Used the Kanga kid digger to move and blend the new soil mix through the garden beds.
Delivery of igneous habitat rocks arrived on site for the ecological garden. Picked up additional asset protection materials ahead of continued works.
Removed English ivy (Hedera helix) from the fence line, and a Malus (apple tree) from the garden bed, clearing the way for the new planting layout.
Fine detailing of the excavation by hand, working in close around the areas the machine can't reach cleanly.
Continued excavation into the second garden bed. The skip bin is now filled and ready for pick-up tomorrow.
With the loader on site and the lawn protected, excavation and removal work got underway. We also shared a behind-the-scenes look at the day on Instagram — some gardens begin with planting, this one begins with subtraction.
Picked up the Kanga mini loader from the hire depot. Purchased and laid asset protection materials across the grassed areas on site ahead of machine work, to keep the lawn from being damaged during excavation.
Booked a mini loader for hire, available from next Tuesday (7 July), to move through the remaining removal work.
Accepted delivery of a 6m³ skip bin on site for the removal waste.
Removed the existing bulbs from the bed and relocated them to a holding spot on site, ready for replanting once the new layout goes in.
Early-stage site preparation. New soil will be imported and machinery sourced for the remaining removal work. For now, onion grass is being cleared manually by hand.